Petkim Aliaga
Administration
PETKİM (Petrol Kimya) A.Ş
Location and Description of the port
Petkim Petroleum and chemical complex is situated in Nemrut Bay laying at the north-eastern coast. Mostly chemicals and petroleum derivatives are handled. Only one berth is assigned for general cargo handling which is used solely for the installations' own needs.
Pilotage
Compulsory. Provided by the administration
Towage Not compulsroy upto 1 000 GRT.
1 tugboat compulsory between 1 000- 4 000 GRT.
2 tugboats compulsory for vessels over 4 000 GRT.
Fresh Water
Available
Bunker
Unavailable. Should it be provided by the suppliers, permission is to be requested from the administration due to safety reasons. |
|
Berthing
Berth |
Length
(m) |
Depth
(m) |
NR.1 |
163 |
7 |
NR.2 |
175 |
10 |
NR.3 |
190 |
6 |
NR.4 |
250 |
10 |
Berth |
338 |
10 |
(Caustic, Fuel oil, Ammonia) |
General Cargo |
(Salt berth) |
|