WE ARE AT SEAS AND SHIPPING MARKETS SINCE 1910 
                                             
Petkim Aliaga
Administration
PETKİM (Petrol Kimya) A.Ş

Location and Description of the port

Petkim Petroleum and chemical complex is situated in Nemrut Bay laying at the north-eastern coast. Mostly chemicals and petroleum derivatives are handled. Only one berth is assigned for general cargo handling which is used solely for the installations' own needs.

Pilotage

Compulsory. Provided by the administration

Towage

Not compulsroy upto 1 000 GRT.
1 tugboat compulsory between 1 000- 4 000 GRT.
2 tugboats compulsory for vessels over 4 000 GRT.

Fresh Water

Available

Bunker

Unavailable. Should it be provided by the suppliers, permission is to be requested from the administration due to safety reasons.

Berthing

Berth
Length
(m)
Depth
(m)
NR.1
163
7
NR.2
175
10
NR.3
190
6
NR.4
250
10
Berth
338
10
(Caustic, Fuel oil, Ammonia)
General Cargo
(Salt berth)

 

Handling Equipment
At tanker berths, fixed line system is assigned. Various mobile cranes are available at general cargo berth. 2x3 tons cranes on rail are available at NR.3 Salt berth

Bulk handling facilities

A grain silo of 95 000 ton capacity will be constructed and the silo will have conveyor system connection with the wuay.
The construction is scheduled for completion in 1992.
 
Air access
İzmir Airport is 100 km. away from the installations.
 
Land access Connected with highway network.
 
 
     
 
All rights reserved to Cetinkaya Shipping